Production Process
/
Wire Cutting
Electronic Component Handling and Plug-ln
Dealing with electronic / components / Plug-in procedures / Wave soldering / Trimming the excess feet
Heating Element Construction
Ceramic winding / Assembling the elements
Handle Assembly
Wire cutting / Soldering plug components / Attaching the heater / Soldering the PCB / Installing plastic components
Air Pump Construction
Processing copper wire / Handling accessories / Installing plastic parts / Self-testing procedures
PCB Calibration and Adjustment
Calibration
Machine Assembly
Encasing / Wiring / Attaching the handle / Installing the air pump / Incorporating the PCB and other / spare parts
Testing Phase
Evaluating handle air volume / Testing air pump pressure / Assessing temperature control
Quality Inspection
Activating and testing the / machine for approximately 3 hours
Packing
Affixing labels / Arranging spare parts / Packing into boxes
Quality Testing
Watch and discover the latest videos from Gordak YouTube Channel.
Certificate



















